Overhead contact systems

OCS Height & Stagger Surveys

Survey-grade OCS wire height and stagger measurement coordinated directly to railway track geometry and chainage.

GEDO track and overhead contact system survey on light rail

Accurate field data.
Useful project answers.

Summit measures overhead contact-system geometry in direct relationship to the running rails. Coordinated track and OCS capture supports construction verification, commissioning, maintenance and clearance assessment without separating the wire data from the track geometry that governs it.

Capabilities

Measured for the railway.

  • Contact-wire height and stagger
  • Track geometry captured concurrently
  • Chainage-based reporting
  • Total-station or control-network positioning
  • As-built and design comparison
  • Transit, LRT and electrified-rail environments

Deliverables

Ready for the project team.

  • Height and stagger schedules
  • 3D wire and rail strings
  • Design-deviation reports
  • CAD-ready data
  • Exception summaries
  • Project-coordinate deliverables

Built around the asset
and the decision.

01OCS construction verification
02Commissioning and acceptance
03Maintenance surveys
04Clearance and interface assessment

Your next project

Discuss your survey
or monitoring requirements.

Summit Infrastructure Ltd.
3201 9 St SE, Calgary, AB T2G 3C1
403-629-6187
Start a conversation